NTDI01 Digital Input Module Installation Procedure
Pre-Installation Preparation
- Verify power supply compatibility: 24V DC nominal (tolerance ±10%)3.
- Ensure installation environment meets IP20 protection rating requirements1.
Hardware Mounting
- Step 1: Align module with slot guides in compatible ABB control rack (e.g., RMB02.2 series).
- Step 2: Firmly press until terminal blocks engage (audible click confirmation)1.
- Step 3: Secure module using DIN rail clips (recommended torque: 0.6 N·m).
Wiring Configuration
- Input Channels: Connect shielded cables to numbered terminals (1-8 for standard NTDI01).
- Grounding: Bond shield drain wires to chassis ground point3.
Power-Up & Verification
- Apply power while monitoring status LED:
- Green: Normal operation
- Red: Fault condition (refer to diagnostic手册).
- Validate signal reception via connected PLC/controller interface4.
Safety Notes
- De-energize power before module replacement1.
- Use ABB-approved tools for terminal tightening (max. 0.8 N·m torque)
NTDI01 ABB PDF
·········································································································
Reviews
Clear filtersThere are no reviews yet.