ABB High-Power IGCT Module System Operation Manual
Components:
textCopy Code
5SHY35L4503 IGCT Phase Module (4.5kV/4kA)
3BHB004693R0001 Gate Unit (Type SNAT 61P)
3BHB004692R0002 Driver Interface Board
5SXE01-0127 Fiber Optic Interface Kit

Critical Safety Protocols
ENERGIZED COMPONENT WARNING
textCopy Code
- DC link capacitors retain lethal charge (>5kV) for 30 mins after shutdown
- Verify voltage <50V using CAT IV 10kV multimeter (Fluke 1587 FC)
ARC FLASH MITIGATION
textCopy Code
- Wear Class 00 gloves + Arc-rated face shield when handling 5SHY35L4503
- Maintain 1.2m clearance during power-on tests
Pre-Operational Verification
Step 1: Insulation Resistance Test
textCopy Code
Test Point | Method | Acceptance Value
-------------------------|--------------------------|-----------------
IGCT Anode-Cathode | 5kV Megger (1 min) | >500 MΩ @ 25°C
Gate Unit Connectors | 500V Megger | >100 MΩ
Fiber Optic Cables | Visual + TDR (Keysight) | <0.5 dB loss
Step 2: Control Interface Validation
textCopy Code
Gate Unit (3BHB004693R0001):
- Apply 24V DC aux power
- Verify status LEDs: GREEN (RDY), YELLOW (OPTO)
Driver Board (3BHB004692R0002):
- Inject 5V test pulse via X150 connector
- Confirm fiber optic TX activation (850nm wavelength)

Power-Up Sequence
plaintextCopy Code
1. Engage DC link precharge:
• Limit current ≤5% Iₙ (use ABB CHPS-600 precharger)
• Duration: 90s minimum
2. Initialize gate units:
• Enable fiber loop (5SXE01-0127 TX→RX)
• Verify gate supply voltage: +15V/-15V ±1%
3. Execute self-test:
• Fire test pulse (tₚ=20μs @ 10% Vₜₕ)
• Monitor di/dt <500 A/μs via Rogowski coil
Operational Parameters
Component | Parameter | Normal Range |
---|---|---|
5SHY35L4503 | Junction Temperature | ≤125°C (de-rated @ >40°C) |
Vₜₕ (Threshold Voltage) | 1.8-2.2V | |
3BHB004693R0001 | Gate Charge (Q₉) | 3.5μC ±10% |
Turn-off Delay (tₚ) | 2.8μs max | |
Driver Board | Fiber Signal Loss | ≤ -12dBm |
Fault Diagnostics
LED Interpretation (Gate Unit 3BHB004693R0001):
LED | Color | State | Fault Condition |
---|---|---|---|
RDY | Green | Off | Aux power missing |
OPTO | Yellow | Flashing | Fiber comm error |
FAULT | Red | Solid | IGCT desaturation detected |
Recovery Procedure for FAULT State:
textCopy Code
1. Isolate DC bus (open ABB HHU 35.5kV breaker)
2. Discharge capacitors via certified path
3. Check:
• IGCT gate-cathode resistance (expect 12Ω ±1Ω)
• Fiber alignment (use ABB FOCS-1 test set)
Maintenance Operations
Semiconductor Replacement (5SHY35L4503):
textCopy Code
1. Clean contact surfaces with Loctite SF 7063
2. Apply thermal compound (Dow Corning DC-340)
3. Fastening torque:
• Main terminals: 25 Nm ±0.5 Nm (crisscross pattern)
• Pressure plate: 8 Nm incremental to 40 Nm
Fiber Interface Service (5SXE01-0127):
textCopy Code
• Cleaning: Use pure IPA + Ferguson FOC-CLEANER swabs
• Inspection: 200x microscope (contamination ≤5μm)
• Bend radius: >35mm (per TIA-568-0-D standard)
5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127 pdf
5SHY35L4503 3BHB004693R0001 3BHB004692R0002 5SXE01-0127
··········································································································
Our advantages:
1. The brand new product comes with a one-year
comprehensive warranty.
2. All products undergo strict quality inspections.
3. Contact us and our team will provide competitive
quotes and procurement plans.
Reviews
Clear filtersThere are no reviews yet.