Fast delivery within 72 Hours

4D1042.00-090 B&R

$522.00

Shipping & Delivery

  • Courier delivery

Our courier will deliver to the specified address

2-3 Days

From $20

  • DHL Courier delivery

DHL courier will deliver to the specified address

2-3 Days

From $40

  • Warranty 1 year
  • Free 30-Day returns

Description

4D1042.00-090 Operational Procedure

Pre-Start Checklist

  1. Power Isolation

    • De-energize the main circuit breaker (CB1) and attach a ‌LOCKOUT TAG‌ with operator ID.
    • Verify zero voltage at test points TP1–TP3 using a multimeter (range: 0–600V AC).
  2. Fluid System Preparation

    • Close upstream/downstream isolation valves (V-101/V-102).
    • Relieve residual pressure via drain port DR-04 until gauge PG1 reads 0 kPa (±0.1 kPa).


Calibration Sequence

Step 1: Sensor Alignment

  1. Loosen M6 mounting bolts (x4) using a 10mm torque wrench (max. 5 N·m).
  2. Position laser alignment tool (P/N: ALN-5570) against reference datum ‌Surface ‘A’‌.
  3. Adjust sensor until green indicator illuminates steadily.
  4. Re-torque bolts to ‌4.8±0.2 N·m‌ in crisscross sequence.

Step 2: Pressure Calibration

plaintextCopy Code
a. Connect calibrated pressure source to test port PT-2.
b. Apply 20 kPa, 50 kPa, and 100 kPa reference points.
c. Adjust trim pot R12 until display reads within ±0.1 kPa of reference.
d. Engage calibration lock screw (clockwise to LOCK position).

Post-Operation Validation

  1. Leak Test

    • Pressurize system to 110% of operating range (max. 120 kPa).
    • Monitor pressure decay for ≤0.5 kPa/min over 10 minutes.
  2. Functional Test

    • Restore power to CB1.
    • Initiate self-test via HMI: ‌Menu > Diagnostics > Run ST-004‌.
    • Confirm all status LEDs show steady GREEN.


 ‌Critical Notices

  • ESD Protection‌: Wear grounded wrist strap when handling PCBs (ESD sensitivity: Class 0).
  • Recalibration Interval‌: Perform full calibration every 6 months or after 500 operating hours.
  • WARNING‌: Do not exceed 120 kPa during testing—rupture disc rated at 125 kPa.

Revision Control

Rev Date Change Summary
00 2023-08-15 Initial release
090 2024-05-30 Added lock screw procedure (Step 2d)

4D1042.00-090 B&R PDF
4D1042.00-090 B&R

···································································································································································································································································································································

Our advantages:
1. The brand new product comes with a one-year comprehensive warranty.
2. All products undergo strict quality inspections.
3. Contact us and our team will provide competitive quotes and procurement plans.

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “4D1042.00-090 B&R”

Your email address will not be published. Required fields are marked *