Fast delivery within 72 Hours

FLOBOSS S600 EMERSON PDF

$225.00

The ‌step-by-step commissioning procedures for Emerson FLOBOSS S600 Flow Manager

Shipping & Delivery

  • Courier delivery

Our courier will deliver to the specified address

2-3 Days

From $20

  • DHL Courier delivery

DHL courier will deliver to the specified address

2-3 Days

From $40

  • Warranty 1 year
  • Free 30-Day returns

Description

The ‌step-by-step commissioning procedures for Emerson FLOBOSS S600 Flow Manager

 ‌Pre-Commissioning Safety Checks

  1. Power Verification

    • Confirm input voltage matches terminal block rating (24 VDC ±10% or 115/230 VAC).
    • Ensure chassis ground resistance ‌<1 Ω‌ using Megger tester.
  2. Sensor Validation

    • PT/CT inputs: Apply 4–20 mA simulation signal; verify raw value readback within ‌±0.1% FS‌.
    • Piping leakage test: Hold test pressure at ‌150% operating range‌ for 15 mins (zero drop tolerance).


 ‌Hardware Initialization

textCopy Code
1. Mount unit vertically (max. 5° deviation) per Section 3.2 of IM-0063.

2. Connect RTD/TC: Use shielded twisted pairs ≤100m; shield grounded at S600 end only.

3. Impulse lines: Purge with inert gas (N2) before pressure transmitter wiring.

 ‌Software Configuration

Using ROCLINK 800 (v4.1+):

  1. Communication Setup

    • Connect via USB/RS-485; set baud rate to ‌19.2kbps (default)‌.
    • Assign unique ‌IP address‌ if Ethernet-enabled (subnet mask: 255.255.255.0).
  2. Flow Equation Load

    textCopy Code
    Configuration > Flow Churches > Select AGA-8 / API MPMS Ch.14.3
    Enter gas composition (mole % accuracy: 0.001)
  3. I/O Mapping

    Hardware Point Software Tag Engineering Unit
    AI1 PT_Wellhead psi
    DI3 Valve_Fail Boolean


 ‌Calibration Sequence

  1. Zero Calibration

    • Isolate pressure sensors; vent to atmosphere → Execute AutoZero in Service Tools.
    • Accept if offset ‌<0.05% URL‌ (Unified Range Limit).
  2. Prover Loop Verification

    textCopy Code
    a) Initiate 10 consecutive prove runs via HART command.

    b) Calculate meter factor: MF = (Proved Vol / S600 Vol)

    c) Pass criteria: |1-MF| ≤ 0.15% with σ ≤ 0.02%.

Operational Testing

textCopy Code
1. Force DI alarms (e.g., close ESDV) → Confirm SOE timestamps ≤100ms latency.

2. Inject 10% step change in flow rate → Check control valve response time <2s.

3. Validate Modbus TCP registers:
- Flow Totalizer (register 40001) vs local total ≤ ±0.01% variance.

‼️ ‌Critical Fault Resolutions

Alarm Corrective Action
FST_FAIL Check sensor excitation voltage (min. 10.5 VDC)
COMM_FAULT Verify termination resistors (120 Ω for RS-485)
PV_OUT_OF_RANGE Recalibrate using master gauge (ASME B40.100 Grade 3A)

 

 

····································································································································································································································································································································

Our advantages:
1. The brand new product comes with a one-year comprehensive warranty.
2. All products undergo strict quality inspections.
3. Contact us and our team will provide competitive quotes and procurement plans.

 

 

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “FLOBOSS S600 EMERSON PDF”

Your email address will not be published. Required fields are marked *