DELOMATIC-3 DGU2 DEIF Controller Operational Procedures
-
Pre-Installation Preparation
- Verify power supply compatibility: 230V AC (±10%), 50/60 Hz.
- Ensure ambient conditions: 0–55°C operating temperature, IP20 enclosure rating3.
- Disconnect all power sources before handling (ESD protection required).
-
Hardware Installation
- Step 1: Mount the controller vertically on DIN rail (EN 60715 standard).
- Step 2: Connect communication cables to RS-485 ports (Terminal X1/X2).
- Step 3: Secure wiring with torque-limited terminals (0.5 N·m max).
-
Software Configuration
- Step 1: Power on and access the DM-3 interface via DEIF PowerCom software (v1.0 or later)3.
- Step 2: Navigate to
Settings > Generator Set
to input rated parameters:- Voltage: 400V AC
- Frequency: 50 Hz
- Step 3: Enable
Auto Synchronization
mode for grid-parallel operation.
-
Functional Testing
- Initiate self-test via
Diagnostics > System Check
. - Monitor LED indicators:
- Green: Normal operation
- Red: Fault detected (check event log under
Alarm Handling
)3.
- Initiate self-test via
-
Safety Protocols
- Isolate power before replacing modules (refer to AGC-4 installation manual3).
- Ground all shield wires to prevent EMI interference.