Symptom Action
LCD blank Check fuse F1 (1A slow-blow)
Communication failure Verify RS485 termination (120Ω)
False tripping Verify CT polarity (X2:1=S1 mark)

Shipping & Delivery

  • Courier delivery

Our courier will deliver to the specified address

2-3 Days

From $20

  • DHL Courier delivery

DHL courier will deliver to the specified address

2-3 Days

From $40

  • Warranty 1 year
  • Free 30-Day returns

Description

ABB Relion 615 Series Protection Relay

Model: 1MRK0023505-AA
Firmware Version: R2.1+
Compliance: IEC 60255-1, IEEE C37.90


Pre-Operational Checks

  1. Hardware Inspection
    • Verify LED indicators:
      • PWR (Green): Steady = 24-250V DC supply OK
      • ALARM (Yellow): Flashing = Self-test in progress
    • Check terminal tightness:
      • Power terminals (X1:1-2): 0.8 Nm torque
      • Binary inputs (X3:1-8): 0.5 Nm torque
  2. Software Configuration

    Required files: - PCM600 project file (*.prj) - CID file (CRC32 verified) Connect via USB/LAN port (192.168.1.10 default)


Operation Sequence

Step 1: Power-Up Procedure

1. Apply auxiliary voltage (Range: 24-250V DC) 2. Observe startup sequence: • 0-2s: Hardware self-test • 3-5s: Firmware checksum verification • 6-8s: Parameter loading from NVROM 3. Confirm "READY" status on LCD

Step 2: Functional Testing

Test Method Pass Criteria
Overcurrent (51) Inject 1.2× pickup current (50Hz) Trip within 35ms ±10%
Earth Fault (50N) Apply 30% In via test kit LED “TRIP” activates
Binary Inputs Short-circuit X3:1-3 to X3:7 LCD shows “DI1 Active”

 

Step 3: Event Logging

1. Press NAVIGATE button → Select "Event Recorder" 2. Trigger test events → Verify timestamps (μs accuracy) 3. Export via USB: • COMTRADE format for Disturbance Recorder • CSV format for sequence-of-events


Safety Protocols

Critical Warnings

  • Never disconnect CT circuits under load (risk of 10kV arcing)
  • Maintain 50mm clearance from high-voltage conductors
  • Disable autoreclose function before testing (Parameter 8531)

 

Lockout/Tagout Requirements

1. Isolate all CT/PT inputs 2. Apply safety ground (X1:PE terminal) 3. Tag with "TEST IN PROGRESS"


Troubleshooting

Symptom Action
LCD blank Check fuse F1 (1A slow-blow)
Communication failure Verify RS485 termination (120Ω)
False tripping Verify CT polarity (X2:1=S1 mark)

 

 

··········································································································

Our advantages:

1. The brand new product comes with a one-year

comprehensive warranty.

2. All products undergo strict quality inspections.

3. Contact us and our team will provide competitive

quotes and procurement plans.

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “1MRK0023505-AA ABB”

Your email address will not be published. Required fields are marked *